BCTC 003.jpg

BCTC NEWTOWN CAMPUS SCIENCE BUILDING

LOCATION

Lexington, Kentucky

 

ARCHITECT 

Omni Architects

CONSTRUCTION MANAGER

Congleton Hacker

PROJECT FACTS

A $20.0 M, 3-story, 66,000 sq ft steel frame building with classrooms, 
laboratories, and offices at the Newtown Campus of Bluegrass 
Community and Technical College.  This project consisted of a steel 
frame structure utilizing composite steel beam construction.  The 
foundation system consists of a series of grade beams supported by 
drilled pier foundations down to rock.  The lateral force resisting system 
utilizes concentrically braced frames. 
 
Architectural and special use considerations included special vibration 
considerations for the floor framing and an exterior pedestrian bridge 
structure. 

ADDITIONAL PROJECT PHOTOS